Renewable Energy · 5–8 t excavators
A solar EPC contractor drilled thousands of pre-holes for mounting piles. Excavator auger drives with rock teeth produced accurate holes through gravelly ground.

Gravel and cobbles deflected piles driven directly, and the schedule required many holes per machine per day.
| Carrier | 5–8 t excavator |
|---|---|
| Torque | 6,931 N·m |
| Bit | 300 mm rock |
| Depth | 2 m with extension |





Oversize granite blocks after blasting were slowing the primary crusher. A 40G-class open breaker on a 36 t excavator reduces boulders at the muck pil…
Read project
A reinforced-concrete frame in a dense neighbourhood had to come down with low noise and minimal dust. A 360° rotating pulverizer crushed walls and se…
Read project
A timber yard replaced a bucket-and-thumb setup with a rotating log grapple, making stacking, sorting and truck loading faster and safer.…
Read projectStart your order
Send the carrier model, auxiliary oil flow and what you need to break, grab, cut or drill. You’ll get a matched model, drawing and price within one working day.